WaterMark
Data Center Water Impact Assessment Tool

WaterMark / Jurisdictions / Davidson County, TN (Nashville)

Davidson County, TN (Nashville): Data Center Water Impact

Reference data for evaluating a data center proposal in Davidson County, TN (Nashville). Every figure below is a stored value with its primary source attached. Facility-scale results are produced by the assessment tool.

Water supply

MetricValueSource / basis
Water utilityMetro Water ServicesUtility of record
Supply sourceCumberland RiverUtility of record
Treatment capacity180 MGDWater stress: WRI Aqueduct 4.0, HUC-8 05130202. Utility: Metro Water Services.
Water rate$5.50 / 1,000 galMetro Water Services published rate schedule
Watershed stressLow-Medium (2 / 5)Water stress: WRI Aqueduct 4.0, HUC-8 05130202. Utility: Metro Water Services.

Watershed consumptive use

Basin: Lower Cumberland (HUC-8 05130202). Figures are consumptive use, not withdrawal, because evaporative data center loss is consumptive. USGS data year 2020.

CategoryConsumptive use (MGD)Share of basin
Residential 70 66.4%
Thermoelectric power 15 14.2%
Industrial 12 11.4%
Irrigation 4 3.8%
Mining 0.5 0.5%
Existing data centers 4 3.8%
Total105.5100.0%

Total is the sum of the categories listed above. Shares are each category divided by that total. Source: USGS Water Use 2020, Davidson County.

Grid generation water (Scope 2)

Generating the electricity a data center consumes evaporates water at the power plant. That volume is real, it is attributable, and it is excluded from most corporate "water positive" accounting. On a thermal grid it is frequently comparable to the facility's own cooling water.

MetricValueSource / basis
Grid regionTVATVA
Electric utilityNashville Electric Service (NES) / TVAUtility of record
Grid water intensity0.44 gal / kWhMacknick et al. 2012 × TVA generation mix (~42% nuclear, 31% gas, 14% coal, 9% hydro, balance other) per TVA
Local peak demand2,400 MWTVA
Modeled rate impact6% to 14%See methodology

Where this water is consumed: TVA generation includes plants in the Cumberland basin (Cumberland Fossil, Gallatin) — meaningful share of Scope 2 water consumed locally.

Run this county at your facility size. The assessment tool computes direct (Scope 1) and indirect (Scope 2) water for a specific load, cooling system, and mitigation stack, with the same citations attached.

Open Davidson County, TN (Nashville) in the assessment tool

Reducing the footprint here

A high stress reading is a design constraint, not a verdict. Closed-loop and dry or hybrid cooling, adiabatic assist, immersion, and reclaimed or non-potable sourcing each move the direct number, and siting against a cleaner grid mix moves the indirect number. The solutions catalog lists each option with its water reduction, its energy and cost tradeoff, and its source.

Regulatory and siting status

Nashville. TVA grid mixes nuclear, gas, hydro, coal. State very business-friendly. High summer wet-bulb is a free-cooling penalty.

Sources: Water: Metro Water Services. Grid: TVA. Incentives: TN DC sales tax exemption.

Comparative siting scores for this county, alongside every other county tracked, are on the US Siting Matrix.

CountyWater sourceWatershed stress
Shelby County, TN (Memphis) Memphis Sand aquifer (groundwater) Low-Medium (1.6/5)

How these numbers are derived

Assumptions, formulas, and the full source list are in the methodology. WaterMark is published by Standard Water Corp and is not affiliated with any data center developer, utility, or government agency.