Hermantown, MN (Duluth): Data Center Water Impact

Reference data for evaluating a data center proposal in Hermantown, MN (Duluth). Every figure below is a stored value with its primary source attached. Facility-scale results are produced by the assessment tool.

Water supply

MetricValueSource / basis
Water utilityHermantown Public UtilitiesUtility of record
Supply sourceSt. Louis River watershed / GroundwaterUtility of record
Treatment capacity4.2 MGDWater stress: WRI Aqueduct 4.0, HUC-8 basin 04010201. Utility data: City of Hermantown 2024 budget.
Water rate$5.40 / 1,000 galHermantown Public Utilities published rate schedule
Watershed stressLow (1.2 / 5)Water stress: WRI Aqueduct 4.0, HUC-8 basin 04010201. Utility data: City of Hermantown 2024 budget.

Watershed consumptive use

Basin: St. Louis River (HUC-8 04010201). Figures are consumptive use, not withdrawal, because evaporative data center loss is consumptive. USGS data year 2020.

CategoryConsumptive use (MGD)Share of basin
Residential 1.5 4.1%
Thermoelectric power 12 32.6%
Industrial 8 21.7%
Irrigation 0.3 0.8%
Mining 15 40.8%
Existing data centers 0 0.0%
Total36.8100.0%

Total is the sum of the categories listed above. Shares are each category divided by that total. Source: USGS Water Use 2020, St. Louis County. Mining: MN DNR Iron Range water reports.

Grid generation water (Scope 2)

Generating the electricity a data center consumes evaporates water at the power plant. That volume is real, it is attributable, and it is excluded from most corporate "water positive" accounting. On a thermal grid it is frequently comparable to the facility's own cooling water.

MetricValueSource / basis
Grid regionMISO NorthMISO
Electric utilityMinnesota PowerUtility of record
Grid water intensity0.37 gal / kWhMacknick et al. 2012 consumption factors, weighted by MN generation mix (EIA)
Local peak demand350 MWMISO
Modeled rate impact18% to 35%See methodology

Where this water is consumed: MISO North generation in this region is partly local (Boswell, Sherco) and partly imported. A meaningful share of Scope 2 water is consumed within or adjacent to the St. Louis River basin.

Run this county at your facility size. The assessment tool computes direct (Scope 1) and indirect (Scope 2) water for a specific load, cooling system, and mitigation stack, with the same citations attached.

Open Hermantown, MN (Duluth) in the assessment tool

Reducing the footprint here

A high stress reading is a design constraint, not a verdict. Closed-loop and dry or hybrid cooling, adiabatic assist, immersion, and reclaimed or non-potable sourcing each move the direct number, and siting against a cleaner grid mix moves the indirect number. The solutions catalog lists each option with its water reduction, its energy and cost tradeoff, and its source.

Regulatory and siting status

Hermantown / Duluth. Lake Superior abundance. MN DNR sensitive on wetlands and Iron Range water. Cool climate excellent for free cooling.

Sources: Water: Hermantown PU + MN DNR. Grid: MISO N (Minnesota Power).

Comparative siting scores for this county, alongside every other county tracked, are on the US Siting Matrix.

How these numbers are derived

Assumptions, formulas, and the full source list are in the methodology. WaterMark is published by Standard Water Corp and is not affiliated with any data center developer, utility, or government agency.