WaterMark
Data Center Water Impact Assessment Tool

WaterMark / Jurisdictions / Charles County, MD

Charles County, MD: Data Center Water Impact

Reference data for evaluating a data center proposal in Charles County, MD. Every figure below is a stored value with its primary source attached. Facility-scale results are produced by the assessment tool.

Water supply

MetricValueSource / basis
Water utilityCharles County DPWUtility of record
Supply sourcePotomac River + groundwaterUtility of record
Treatment capacity9 MGDWater stress: WRI Aqueduct 4.0, HUC-8 02070011. Adjacent to PG County stress profile.
Water rate$8.50 / 1,000 galCharles County DPW published rate schedule
Watershed stressMedium-High (2.8 / 5)Water stress: WRI Aqueduct 4.0, HUC-8 02070011. Adjacent to PG County stress profile.

Watershed consumptive use

Basin: Lower Potomac (HUC-8 02070011). Figures are consumptive use, not withdrawal, because evaporative data center loss is consumptive. USGS data year 2020.

CategoryConsumptive use (MGD)Share of basin
Residential 4 49.4%
Thermoelectric power 2 24.7%
Industrial 0.8 9.9%
Irrigation 1 12.3%
Mining 0.1 1.2%
Existing data centers 0.2 2.5%
Total8.1100.0%

Total is the sum of the categories listed above. Shares are each category divided by that total. Source: USGS Water Use 2020, Charles County.

Grid generation water (Scope 2)

Generating the electricity a data center consumes evaporates water at the power plant. That volume is real, it is attributable, and it is excluded from most corporate "water positive" accounting. On a thermal grid it is frequently comparable to the facility's own cooling water.

MetricValueSource / basis
Grid regionPJM InterconnectionPJM
Electric utilitySMECO / PEPCOUtility of record
Grid water intensity0.42 gal / kWhMacknick et al. 2012 × PJM GATS EY2024
Local peak demand320 MWPJM
Modeled rate impact14% to 28%See methodology

Where this water is consumed: PJM grid plants serving Charles County are distributed across the multi-state grid.

Run this county at your facility size. The assessment tool computes direct (Scope 1) and indirect (Scope 2) water for a specific load, cooling system, and mitigation stack, with the same citations attached.

Open Charles County, MD in the assessment tool

Reducing the footprint here

A high stress reading is a design constraint, not a verdict. Closed-loop and dry or hybrid cooling, adiabatic assist, immersion, and reclaimed or non-potable sourcing each move the direct number, and siting against a cleaner grid mix moves the indirect number. The solutions catalog lists each option with its water reduction, its energy and cost tradeoff, and its source.

Regulatory and siting status

Adjacent to PG County. Watching for spillover. Less infrastructure than NoVA.

Sources: Water: Charles County DPW. Grid: PJM PEPCO zone.

Comparative siting scores for this county, alongside every other county tracked, are on the US Siting Matrix.

CountyWater sourceWatershed stress
Prince George's County, MD Potomac River High (3.4/5)
Loudoun County, VA Potomac River / Goose Creek Reservoir High (3.4/5)
Prince William County, VA Occoquan Reservoir High (3.4/5)
Henrico County, VA James River Medium (2.6/5)
Mecklenburg County, VA Roanoke River / Buggs Island Lake Low-Medium (1.8/5)

How these numbers are derived

Assumptions, formulas, and the full source list are in the methodology. WaterMark is published by Standard Water Corp and is not affiliated with any data center developer, utility, or government agency.