WaterMark
Data Center Water Impact Assessment Tool

WaterMark / Jurisdictions / Loudoun County, VA

Loudoun County, VA: Data Center Water Impact

Reference data for evaluating a data center proposal in Loudoun County, VA. Every figure below is a stored value with its primary source attached. Facility-scale results are produced by the assessment tool.

Water supply

MetricValueSource / basis
Water utilityLoudoun WaterUtility of record
Supply sourcePotomac River / Goose Creek ReservoirUtility of record
Treatment capacity62 MGDWater stress: WRI Aqueduct 4.0, HUC-8 basin 02070008. Utility data: Loudoun Water 2024 Annual Report.
Water rate$8.65 / 1,000 galLoudoun Water published rate schedule
Watershed stressHigh (3.4 / 5)Water stress: WRI Aqueduct 4.0, HUC-8 basin 02070008. Utility data: Loudoun Water 2024 Annual Report.

Watershed consumptive use

Basin: Middle Potomac-Catoctin (HUC-8 02070008). Figures are consumptive use, not withdrawal, because evaporative data center loss is consumptive. USGS data year 2020.

CategoryConsumptive use (MGD)Share of basin
Residential 6 16.5%
Thermoelectric power 3 8.2%
Industrial 1 2.7%
Irrigation 1 2.7%
Mining 0.4 1.1%
Existing data centers 25 68.7%
Total36.4100.0%

Total is the sum of the categories listed above. Shares are each category divided by that total. Source: USGS Water Use 2020, Loudoun County. Existing data center segment: Loudoun Water non-residential customer reports.

Grid generation water (Scope 2)

Generating the electricity a data center consumes evaporates water at the power plant. That volume is real, it is attributable, and it is excluded from most corporate "water positive" accounting. On a thermal grid it is frequently comparable to the facility's own cooling water.

MetricValueSource / basis
Grid regionPJM InterconnectionPJM
Electric utilityDominion EnergyUtility of record
Grid water intensity0.42 gal / kWhMacknick et al. 2012 consumption factors, weighted by PJM GATS EY2024 generation mix
Local peak demand1,200 MWPJM
Modeled rate impact10% to 20%See methodology

Where this water is consumed: PJM grid plants serving Loudoun are distributed across MD, VA, PA, OH and WV. Scope 2 water for the existing Data Center Alley load is consumed largely outside the local Potomac basin.

Run this county at your facility size. The assessment tool computes direct (Scope 1) and indirect (Scope 2) water for a specific load, cooling system, and mitigation stack, with the same citations attached.

Open Loudoun County, VA in the assessment tool

Reducing the footprint here

A high stress reading is a design constraint, not a verdict. Closed-loop and dry or hybrid cooling, adiabatic assist, immersion, and reclaimed or non-potable sourcing each move the direct number, and siting against a cleaner grid mix moves the indirect number. The solutions catalog lists each option with its water reduction, its energy and cost tradeoff, and its source.

Regulatory and siting status

Data Center Alley — saturated. ~25 MGD existing DC consumptive use; transmission constraints; growing community pushback. On 22 Jul 2026 the Board of Supervisors voted 6-1 to direct staff to prepare a temporary pause on new data center applications, site plans, and substations, for decision 15 Sep 2026. Nothing is adopted; the County Attorney has said he does not believe the Board has authority under the Dillon Rule to impose one. A separate item ending the grandfathering of pre-Feb 2025 by-right applications is set for introduction 1 Sep 2026.

Sources: Water: Loudoun Water 2024 report. Grid: PJM. Incentives: VA Code §58.1-609.3. Pause proposal: Virginia Business, Jul 2026; Virginia Mercury, 17 Aug 2026. Grandfathering repeal: Virginia Business, 21 Aug 2026.

Comparative siting scores for this county, alongside every other county tracked, are on the US Siting Matrix.

CountyWater sourceWatershed stress
Prince William County, VA Occoquan Reservoir High (3.4/5)
Henrico County, VA James River Medium (2.6/5)
Mecklenburg County, VA Roanoke River / Buggs Island Lake Low-Medium (1.8/5)
Spotsylvania County, VA Rappahannock River Medium (2.4/5)
Frederick County, VA Shenandoah River + Anderson Lake Low-Medium (2/5)

How these numbers are derived

Assumptions, formulas, and the full source list are in the methodology. WaterMark is published by Standard Water Corp and is not affiliated with any data center developer, utility, or government agency.