WaterMark
Data Center Water Impact Assessment Tool

WaterMark / Jurisdictions / DeKalb County, GA

DeKalb County, GA: Data Center Water Impact

Reference data for evaluating a data center proposal in DeKalb County, GA. Every figure below is a stored value with its primary source attached. Facility-scale results are produced by the assessment tool.

Water supply

MetricValueSource / basis
Water utilityDeKalb CountyUtility of record
Supply sourceChattahoochee + reservoirsUtility of record
Treatment capacity110 MGDWater stress: WRI Aqueduct 4.0, HUC-8 03130001.
Water rate$7.00 / 1,000 galDeKalb County published rate schedule
Watershed stressHigh (3.8 / 5)Water stress: WRI Aqueduct 4.0, HUC-8 03130001.

Watershed consumptive use

Basin: Upper Chattahoochee (HUC-8 03130001). Figures are consumptive use, not withdrawal, because evaporative data center loss is consumptive. USGS data year 2020.

CategoryConsumptive use (MGD)Share of basin
Residential 55 72.2%
Thermoelectric power 10 13.1%
Industrial 6 7.9%
Irrigation 2 2.6%
Mining 0.2 0.3%
Existing data centers 3 3.9%
Total76.2100.0%

Total is the sum of the categories listed above. Shares are each category divided by that total. Source: USGS Water Use 2020, DeKalb County.

Grid generation water (Scope 2)

Generating the electricity a data center consumes evaporates water at the power plant. That volume is real, it is attributable, and it is excluded from most corporate "water positive" accounting. On a thermal grid it is frequently comparable to the facility's own cooling water.

MetricValueSource / basis
Grid regionSouthern (GA Power)Georgia Power
Electric utilityGeorgia PowerUtility of record
Grid water intensity0.4 gal / kWhMacknick et al. 2012 × GA Power generation mix
Local peak demand2,200 MWGeorgia Power
Modeled rate impact6% to 14%See methodology

Where this water is consumed: Same Chattahoochee basin context as Fulton/Gwinnett.

Run this county at your facility size. The assessment tool computes direct (Scope 1) and indirect (Scope 2) water for a specific load, cooling system, and mitigation stack, with the same citations attached.

Open DeKalb County, GA in the assessment tool

Reducing the footprint here

A high stress reading is a design constraint, not a verdict. Closed-loop and dry or hybrid cooling, adiabatic assist, immersion, and reclaimed or non-potable sourcing each move the direct number, and siting against a cleaner grid mix moves the indirect number. The solutions catalog lists each option with its water reduction, its energy and cost tradeoff, and its source.

Regulatory and siting status

Atlanta E suburbs. Under a data center moratorium extended 7 Jul 2026 into early 2027. The Commission unanimously denied the proposed data center text amendment on 23 Jun 2026, so no data center zoning standards are in force.

Sources: Water: DeKalb County. Grid: Georgia Power. Moratorium: Engage DeKalb (county); Decaturish.

Comparative siting scores for this county, alongside every other county tracked, are on the US Siting Matrix.

CountyWater sourceWatershed stress
Fulton County, GA (Atlanta) Chattahoochee River / Lake Lanier High (3.8/5)
Gwinnett County, GA Lake Lanier (Chattahoochee) High (3.8/5)

How these numbers are derived

Assumptions, formulas, and the full source list are in the methodology. WaterMark is published by Standard Water Corp and is not affiliated with any data center developer, utility, or government agency.