Reference data for evaluating a data center proposal in Gwinnett County, GA. Every figure below is a stored value with its primary source attached. Facility-scale results are produced by the assessment tool.

Water supply

MetricValueSource / basis
Water utilityGwinnett County DWRUtility of record
Supply sourceLake Lanier (Chattahoochee)Utility of record
Treatment capacity130 MGDWater stress: WRI Aqueduct 4.0, HUC-8 03130001. Same Lake Lanier supply pressure as Fulton.
Water rate$6.50 / 1,000 galGwinnett County DWR published rate schedule
Watershed stressHigh (3.8 / 5)Water stress: WRI Aqueduct 4.0, HUC-8 03130001. Same Lake Lanier supply pressure as Fulton.

Watershed consumptive use

Basin: Upper Chattahoochee (HUC-8 03130001). Figures are consumptive use, not withdrawal, because evaporative data center loss is consumptive. USGS data year 2020.

CategoryConsumptive use (MGD)Share of basin
Residential 65 69.7%
Thermoelectric power 12 12.9%
Industrial 8 8.6%
Irrigation 3 3.2%
Mining 0.2 0.2%
Existing data centers 5 5.4%
Total93.2100.0%

Total is the sum of the categories listed above. Shares are each category divided by that total. Source: USGS Water Use 2020, Gwinnett County.

Grid generation water (Scope 2)

Generating the electricity a data center consumes evaporates water at the power plant. That volume is real, it is attributable, and it is excluded from most corporate "water positive" accounting. On a thermal grid it is frequently comparable to the facility's own cooling water.

MetricValueSource / basis
Grid regionSouthern (GA Power)Georgia Power
Electric utilityGeorgia PowerUtility of record
Grid water intensity0.4 gal / kWhMacknick et al. 2012 × GA Power generation mix
Local peak demand2,400 MWGeorgia Power
Modeled rate impact6% to 14%See methodology

Where this water is consumed: Same as Fulton — GA Power generation in or near the basin.

Run this county at your facility size. The assessment tool computes direct (Scope 1) and indirect (Scope 2) water for a specific load, cooling system, and mitigation stack, with the same citations attached.

Open Gwinnett County, GA in the assessment tool

Reducing the footprint here

A high stress reading is a design constraint, not a verdict. Closed-loop and dry or hybrid cooling, adiabatic assist, immersion, and reclaimed or non-potable sourcing each move the direct number, and siting against a cleaner grid mix moves the indirect number. The solutions catalog lists each option with its water reduction, its energy and cost tradeoff, and its source.

Regulatory and siting status

Atlanta NE suburbs. Gwinnett aggressively recruits DCs. Same Lanier supply pressure as Fulton.

Sources: Water: Gwinnett DWR. Grid: Georgia Power.

Comparative siting scores for this county, alongside every other county tracked, are on the US Siting Matrix.

CountyWater sourceWatershed stress
Fulton County, GA (Atlanta) Chattahoochee River / Lake Lanier High (3.8/5)
DeKalb County, GA Chattahoochee + reservoirs High (3.8/5)

How these numbers are derived