Water supply

MetricValueSource / basis
Water utilityUpper Trinity Regional Water DistrictUtility of record
Supply sourceTrinity RiverUtility of record
Treatment capacity120 MGDWater stress: WRI Aqueduct 4.0, HUC-8 12030103.
Water rate$5.00 / 1,000 galUpper Trinity Regional Water District published rate schedule
Watershed stressHigh (3.5 / 5)Water stress: WRI Aqueduct 4.0, HUC-8 12030103.

Watershed consumptive use

Basin: Elm Fork Trinity (HUC-8 12030103). Figures are consumptive use, not withdrawal, because evaporative data center loss is consumptive. USGS data year 2020.

CategoryConsumptive use (MGD)Share of basin
Residential 70 58.8%
Thermoelectric power 18 15.1%
Industrial 10 8.4%
Irrigation 12 10.1%
Mining 1 0.8%
Existing data centers 8 6.7%
Total119100.0%

Total is the sum of the categories listed above. Shares are each category divided by that total. Source: USGS Water Use 2020, Denton County.

Grid generation water (Scope 2)

Generating the electricity a data center consumes evaporates water at the power plant. That volume is real, it is attributable, and it is excluded from most corporate "water positive" accounting. On a thermal grid it is frequently comparable to the facility's own cooling water.

MetricValueSource / basis
Grid regionERCOTERCOT
Electric utilityOncorUtility of record
Grid water intensity0.22 gal / kWhMacknick et al. 2012 × ERCOT generation mix
Local peak demand2,400 MWERCOT
Modeled rate impact5% to 12%See methodology

Where this water is consumed: ERCOT generation in-state; a portion of Scope 2 water is consumed within the Trinity basin.

Run this county at your facility size. The assessment tool computes direct (Scope 1) and indirect (Scope 2) water for a specific load, cooling system, and mitigation stack, with the same citations attached.

Open Denton County, TX (DFW) in the assessment tool

Reducing the footprint here

A high stress reading is a design constraint, not a verdict. Closed-loop and dry or hybrid cooling, adiabatic assist, immersion, and reclaimed or non-potable sourcing each move the direct number, and siting against a cleaner grid mix moves the indirect number. The solutions catalog lists each option with its water reduction, its energy and cost tradeoff, and its source.

Regulatory and siting status

Dallas-Fort Worth NW. Trinity basin. Cheap ERCOT power; significant DC growth. Statewide: on 3 Aug 2026 the Governor directed the PUCT and ERCOT to audit every data center in the interconnection queue before any further project may advance, and ERCOT paused its Batch Zero study. The audit requires each project to disclose projected annual and peak water consumption, water sources, and cooling technology.

Sources: Water: Upper Trinity RWD. Grid: ERCOT. Statewide audit: Office of the Governor, 3 Aug 2026.

Comparative siting scores for this county, alongside every other county tracked, are on the US Siting Matrix.

CountyWater sourceWatershed stress
Williamson County, TX (Austin metro) Brazos River + Edwards Aquifer + reservoirs High (4/5)
Bexar County, TX (San Antonio) Edwards Aquifer + diversified portfolio Extremely High (4.2/5)

How these numbers are derived

Assumptions, formulas, and the full source list are in the methodology. WaterMark is published by Standard Water Corp and is not affiliated with any data center developer, utility, or government agency.