Water supply
| Metric | Value | Source / basis |
|---|---|---|
| Water utility | Spotsylvania County | Utility of record |
| Supply source | Rappahannock River | Utility of record |
| Treatment capacity | 14 MGD | Water stress: WRI Aqueduct 4.0, HUC-8 02080103. |
| Water rate | $6.50 / 1,000 gal | Spotsylvania County published rate schedule |
| Watershed stress | Medium (2.4 / 5) | Water stress: WRI Aqueduct 4.0, HUC-8 02080103. |
Watershed consumptive use
Basin: Rappahannock (HUC-8 02080103). Figures are consumptive use, not withdrawal, because evaporative data center loss is consumptive. USGS data year 2020.
| Category | Consumptive use (MGD) | Share of basin |
|---|---|---|
| Residential | 4 | 44.0% |
| Thermoelectric power | 2 | 22.0% |
| Industrial | 0.8 | 8.8% |
| Irrigation | 1.2 | 13.2% |
| Mining | 0.1 | 1.1% |
| Existing data centers | 1 | 11.0% |
| Total | 9.1 | 100.0% |
Total is the sum of the categories listed above. Shares are each category divided by that total. Source: USGS Water Use 2020, Spotsylvania County.
Grid generation water (Scope 2)
Generating the electricity a data center consumes evaporates water at the power plant. That volume is real, it is attributable, and it is excluded from most corporate "water positive" accounting. On a thermal grid it is frequently comparable to the facility's own cooling water.
| Metric | Value | Source / basis |
|---|---|---|
| Grid region | PJM Interconnection | PJM |
| Electric utility | Dominion / Rappahannock Electric Coop | Utility of record |
| Grid water intensity | 0.42 gal / kWh | Macknick et al. 2012 × PJM GATS EY2024 |
| Local peak demand | 380 MW | PJM |
| Modeled rate impact | 10% to 22% | See methodology |
Where this water is consumed: PJM grid; Scope 2 water at distributed plants outside the Rappahannock basin.
Run this county at your facility size. The assessment tool computes direct (Scope 1) and indirect (Scope 2) water for a specific load, cooling system, and mitigation stack, with the same citations attached.
Reducing the footprint here
A high stress reading is a design constraint, not a verdict. Closed-loop and dry or hybrid cooling, adiabatic assist, immersion, and reclaimed or non-potable sourcing each move the direct number, and siting against a cleaner grid mix moves the indirect number. The solutions catalog lists each option with its water reduction, its energy and cost tradeoff, and its source.
Regulatory and siting status
Mid-VA. Mixed track record on siting; some projects approved, some pushed back.
- Hyperscale activity
Sources: Water: Spotsylvania County. Grid: PJM Dominion.
Comparative siting scores for this county, alongside every other county tracked, are on the US Siting Matrix.
Related counties
| County | Water source | Watershed stress |
|---|---|---|
| Loudoun County, VA | Potomac River / Goose Creek Reservoir | High (3.4/5) |
| Prince William County, VA | Occoquan Reservoir | High (3.4/5) |
| Henrico County, VA | James River | Medium (2.6/5) |
| Mecklenburg County, VA | Roanoke River / Buggs Island Lake | Low-Medium (1.8/5) |
| Frederick County, VA | Shenandoah River + Anderson Lake | Low-Medium (2/5) |
How these numbers are derived