Reference data for evaluating a data center proposal in Morrow County, OR (Boardman). Every figure below is a stored value with its primary source attached. Facility-scale results are produced by the assessment tool.
Water supply
| Metric | Value | Source / basis |
|---|---|---|
| Water utility | Morrow County | Utility of record |
| Supply source | Columbia River | Utility of record |
| Treatment capacity | 5 MGD | Water stress: WRI Aqueduct 4.0, HUC-8 17070101. |
| Water rate | $3.50 / 1,000 gal | Morrow County published rate schedule |
| Watershed stress | Low (1.6 / 5) | Water stress: WRI Aqueduct 4.0, HUC-8 17070101. |
Watershed consumptive use
Basin: Lower Columbia (HUC-8 17070101). Figures are consumptive use, not withdrawal, because evaporative data center loss is consumptive. USGS data year 2020.
| Category | Consumptive use (MGD) | Share of basin |
|---|---|---|
| Residential | 1.5 | 1.6% |
| Thermoelectric power | 0.5 | 0.5% |
| Industrial | 6 | 6.2% |
| Irrigation | 80 | 83.2% |
| Mining | 0.2 | 0.2% |
| Existing data centers | 8 | 8.3% |
| Total | 96.2 | 100.0% |
Total is the sum of the categories listed above. Shares are each category divided by that total. Source: USGS Water Use 2020, Morrow County.
Grid generation water (Scope 2)
Generating the electricity a data center consumes evaporates water at the power plant. That volume is real, it is attributable, and it is excluded from most corporate "water positive" accounting. On a thermal grid it is frequently comparable to the facility's own cooling water.
| Metric | Value | Source / basis |
|---|---|---|
| Grid region | BPA / Northwest | BPA |
| Electric utility | PacifiCorp / BPA | Utility of record |
| Grid water intensity | 0.1 gal / kWh | Macknick et al. 2012 × BPA hydro + onsite renewables (Wheatridge). |
| Local peak demand | 600 MW | BPA |
| Modeled rate impact | 5% to 12% | See methodology |
Where this water is consumed: BPA hydro in-basin; Wheatridge wind/solar/storage onsite for some loads.
Run this county at your facility size. The assessment tool computes direct (Scope 1) and indirect (Scope 2) water for a specific load, cooling system, and mitigation stack, with the same citations attached.
Reducing the footprint here
A high stress reading is a design constraint, not a verdict. Closed-loop and dry or hybrid cooling, adiabatic assist, immersion, and reclaimed or non-potable sourcing each move the direct number, and siting against a cleaner grid mix moves the indirect number. The solutions catalog lists each option with its water reduction, its energy and cost tradeoff, and its source.
Regulatory and siting status
Boardman. Sparsely populated. BPA hydro plus Wheatridge wind/solar/storage.
- Hyperscale activity
- Renewable-heavy grid
Sources: Water: Morrow County. Grid: BPA + onsite renewables.
Comparative siting scores for this county, alongside every other county tracked, are on the US Siting Matrix.
Related counties
| County | Water source | Watershed stress |
|---|---|---|
| Umatilla County, OR (Hermiston / Boardman) | Columbia River + Umatilla | Low (1.8/5) |
| Washington County, OR (Hillsboro) | Tualatin River (Barney Reservoir / Trask transbasin) | Medium-High (2.6/5) |
| Grant County, WA (Quincy) | Columbia River | Low (1.5/5) |
How these numbers are derived